A floor screed is a layer laid over a base to establish the level, falls, and surface needed for the final floor finish. A traditional sand and cement leveling screed can be bonded to concrete, separated from it by a membrane, or laid over insulation as a floating system. The right build-up depends on the base, available depth, loads, and the requirements of the flooring above it.
Before work starts, coordinate the finished levels with the structural slab, thresholds, drainage, and adjacent finishes. Then agree how to inspect the installed screed and what evidence the flooring installer needs before starting. A surface can look smooth and still have an incorrect fall, a weak spot, or more moisture than the chosen adhesive allows. Each condition requires a separate check.
Table of Contents
1. Define what the floor screed must do
Identify which layer will take the structural loads and which layer will receive the finish. In a typical leveling build-up, the structural slab carries the design loads, and the screed provides the surface and geometry specified for the flooring. Confirm whether the floor screed must form falls, enclose underfloor heating, or meet an acoustic build-up. Those choices affect its depth, support, and joint details. See The Concrete Centre guidance on screed types and applications.
A traditional sand and cement screed is normally compacted and struck off to guides. A thin proprietary self-leveling underlayment is often used to smooth a sound, compatible base before a finish is installed. Decide whether the job needs a full layer to establish levels and falls or a smaller correction to surface regularity. Confirm the approved thickness and use for any proprietary material. See our guide to self-leveling underlayment.
2. Specify bonded screed where the base can provide a bond
A bonded floor screed relies on adhesion to the substrate. Start by confirming that the concrete is sound and that the approved preparation can remove laitance, contamination, and any incompatible coating. Then check the specified surface profile and bonding system. Where the procedure calls for fresh screed to be placed into a live bonding coat, organize the crew to keep within that window. Document the condition before the prepared base and coat are concealed.
Suppose the same room includes an original slab and a previously repaired strip. The clean surface of the strip tells you little about its compatibility with the new screed. Identify the repair material where possible, check the bond and preparation requirements, and agree how to deal with the transition. If a trial area or bond test is specified, review the result before authorizing production. A single preparation method may need a different sequence at the repair.
3. Detail unbonded screed as a separated layer
An unbonded floor screed is intentionally isolated from the slab by a separating layer. Confirm that the membrane suits the system and identify its intended function. A separation layer and a damp-proof layer can have different requirements. Check laps, upturns, and penetrations against the details, and deal with damage before the screed goes down. Wrinkles or poorly supported areas can affect the screed depth or shape and are easier to correct while the membrane is visible.
Because an unbonded screed acts independently of the base, the specified depth and bay layout matter to its behavior. Confirm the provision for shrinkage and curling at free edges and joints. For example, where a corridor connects two rooms through a narrow doorway, review the joint detail before laying either side. With the junction drawn in advance, the screeding and flooring crews can coordinate where each layer stops, continues, or receives a movement profile.

4. Coordinate floating screed with insulation and services
A floating floor screed sits on thermal or acoustic insulation. Verify the approved insulation, its load and deformation properties for the intended build-up, and the condition of its support. Boards should fit the specified layout, with joints and edge isolation detailed so the finished floor meets the intended performance. Check the arrangement at columns, thresholds, and penetrations, where a misplaced rigid contact can bypass the acoustic separation or make the screed edge harder to finish correctly.
For heated floors, coordinate the pipe or cable layout and the required screed depth above it with the heating and screed suppliers. Confirm any specified pre-cover tests before placing the screed. Photograph concealed runs with references to the room or grid, and agree the heating commissioning sequence with the flooring installer. That record is useful if the crew later needs to test moisture, form a joint, or fix a threshold near a buried service.
5. Check elevations, falls, and depth before placing
Survey the base and compare readings with the intended top of screed and finished floor. High spots can leave the floor screed too thin even when the nominal section looks adequate. Low areas increase depth, material demand, and potentially drying time. Use an agreed benchmark and mark the points where a narrow depth range, recessed threshold, or change of finish makes the build-up sensitive. Confirm how to resolve variations before the crew starts mixing.
At a wet-area door, work back from the intended finished threshold through the tile, adhesive, and any waterproofing layer in the approved build-up. Then check the required fall to the drain and the resulting screed depth along that path. A screed surface can be suitably flat along a slope and still miss the intended drain elevation. Record finished levels and surface regularity separately so each can be checked using the agreed method.
Review the measured floor screed depths with the drawings before releasing the area. Where the available depth is outside the approved range, flag the location for resolution. A local high spot might need an approved change to the base, while a wider discrepancy can affect the threshold or finish build-up. Keep the survey and resolution together so the screeding crew works from the corrected levels.
6. Control mixing, compaction, and protection
Use the approved mix, check the materials on delivery, and control batch water according to the specification or supplier’s instructions. Record anything that changes during the work, including material lots or delivery delays. For a traditional floor screed, compact the material consistently at guides, corners, and edges, then strike it off and finish it as specified. Check transitions while the material can still be worked, especially where a thin finish will reveal ridges or hollows.
Plan work in bays the crew can complete and protect. Identify where day joints and movement joints belong before a delay forces a stop. After placing, follow the specified curing and protection regime, including limits on access and loading. When drying can begin, manage it in accordance with the system requirements. Keep the two stages clear on the schedule. Foot traffic, early loading, and floor-covering installation can each have different release conditions.
7. Test the floor screed against the finish requirements
Before the flooring installer mobilizes, check elevations and falls, then measure surface regularity with the method and tolerance the job specifies. Mark the test locations and include transitions and areas beneath large-format units. Inspect for cracks, loose edges, weak surfaces, and suspected debonding. Where the specification calls for soundness or bond testing, use the agreed method and acceptance criteria. A visual inspection helps locate concerns, while the required test provides evidence for release.
Verify moisture using the method and limit approved for the screed and final flooring system. An acceptable result for a tile system may have little bearing on a timber or resilient finish with a different adhesive. Test the locations and conditions called for in the plan, and record the readings with the screed type and date. Some proprietary screeds specify a particular method, as illustrated by the ARDEX A 38 MIX technical instructions.
If the floor screed is ready in one room but fails a moisture check in another, separate the two release decisions. Record the room, test conditions, and next check for the affected area. Investigate sources of moisture if the result stays high, and use an approved remediation procedure if one is proposed. A floor that has been open for the planned drying period still needs the specified evidence before it is covered.
8. Release the screed with a clear handover
Make the handover useful to someone who was absent during placement. Include the floor screed system, bay layout, service records, elevations, test results, and any agreed repairs. Show where movement joints must be respected in the covering and who signs off the substrate. If repairs are required, map them and record the follow-up inspection or retest for the affected condition before closing the item. Keep the installer informed about exactly which areas are ready.
For example, the floor screed in a room can meet the moisture requirement yet still need a local repair at a threshold before vinyl goes down. Record the outstanding item so the flooring crew can plan its sequence without guessing which test takes precedence. To discuss coordination between the slab, screed, and floor finish, see our construction services or share the floor build-up and finish schedule with Aloda.
Frequently Asked Questions
Is traditional screed the same as self-leveling underlayment?
A traditional leveling screed is usually compacted and struck off to the specified geometry. A proprietary self-leveling underlayment generally flows across a prepared base to improve its surface. Choose the system by checking the required depth, falls, substrate, and floor finish against its permitted uses and installation details.
How do I choose between bonded, unbonded, and floating screed?
Choose based on how the screed is supported and what the floor assembly must achieve. A bonded system needs a sound, compatible base. An unbonded system uses a separating layer. A floating system sits over insulation. In each case, verify the depth, loads, joints, and finish compatibility in the project documents.
When is a screed ready to receive flooring?
Release it once the specified surface, level, soundness, and moisture checks applicable to the finish have been accepted. Confirm readiness for the particular covering and adhesive, including any preparation they require. Record the location of each test so the flooring installer can identify the areas cleared for installation.